The globe valve inspection and expediting service
#1
Process Supervision
•  Casting & Forging

  Globe valve inspection
  To be certain that casting/forging process follow proven procedures
•  Heat Treatment
  To be sure that heat treatment is done properly for all parts, that no portion of the product is overlooked
•  Chemical Analysis & Mechanical Property Tests (and Non Destruction Test).To be certain that[font=宋体]:[/font]
    a)    The tests are really carried out
    b)    Material certificates use actual test data
• Assembling
    a)    Check internal cleanliness prior to assembling
    b)    Check whether quantity, material and type of internal parts meet specification requirements
    c)    Check whether construction details of the assembled products comply with specific requirements of the customers, based on Customer's Technical  
Specification, and /or Customer Approved Drawing

Pressure Test 
    a)    Evaluate whether vendor's pressure test procedure documents meet the standards or client's requirements
    b)    Ensure that the medium components of pressure test meet standard requirements
    c)    Ensure that the pressure test equipment was calibrated
    d)    Ensure that the process of pressure test was in accordance with the procedure and standard
     e)    Check for leakage or calculate the leakage rate
     f)     Ensure that the duration of pressure test and pressure holding meets the standard requirements
 
•  Paint Application
    a)    Inspect pre-processing and surface condition prior to each paint layer application
    b)    Measure thickness of each layer applied paint
    c)    Adhesive test
    d)    Check protection on un-paint area
•  Dispatch
    a)    Check name-plates and, tags
    b)    Check whether protections on each product are according to order
    c)    Check whether sort and construction of packing box/case are in accordance to order
    d)    Check marking on wooden case
    e)    Check whether documents in wooden case are according to order
    f)     Quality control services

 
Inspection on among others
  Casting & Forging thickness check
  Dimension measurement on machined parts
 Torque Measurement
  Certification Control
  Magnetic Partial Test
  Ultrasonic Test for welding area
  Casting & Forging surface examination
  Mechnical properties test
  Painting thickness measurement
  Radiographic Test
  Dye-Penetrant Test
  Fugitive Emission Test
  Cryogenic Test

* Testing & interpretation is outsourced to associated ASNT qualified third party laboratories. J-PECO's own inspection services are limited to test witnessing to see whether:
   Testers of suppliers are qualified
   Procedures are correct
   Reports are up to standard

 
Expediting
•  At site production progress check and give customer timely feedback
•  Make assessment on achievability of delivery time
•  Expediting
•  Trouble shooting
•  At site order management & coordination


http://www.qczoom.com/article_read_40.html